Fabricating The Mast Head Bracket
Last night I started the work on fabricating the Mast Head bracket. The plan was simple, determine the length needed,…
Read MoreThe last part of my Boom topping lift was a simple line looped through a shackle on the boom topping lift cable and another on the bracket attached to the…
So, Miss Megan has been in the water a few days and I've discovered a few things I wasn't expecting. I knew she still needed some cleaning in the interior,…
It's finally happened Miss Megan flew into her new home! Ready to fly? It's a bird....... Just about there Splash down Here is Miss Megan in her berth ready for…